You must log in or # to comment.
Jesus, it went from $14bn to over $30bn in cost overruns? That’s embarrassing.
That’s the engineering knowledge lost over the last 30 years costed out.
Making 2 reactors since 95 has some side effects, a lot of the senior engineers since then have retired, standards have changed, and new engineers need to learn.
- I thought it had been longer than that since we commissioned a nuclear power plant, and
- Does one every eight years or so feel like a decent rate for building these things?